
Uni-systems' diffuser design has always been a benchmark for the industry since the first diffuser was built in 1983, showed record results in efficiency, reliability, power consumption and operating costs. Nowadays the diffision concept is widely accepted as a proven alternative to the conventional sugar mill tandem. Uni-systems has since then designed more that 30 units which are operating in Brazil, Latin America and United States either replacing existing milling installation or in new grass root sugar and ethanol plants. The references listed in this page are some of the most representative projects in whyich we have paericipated either by providing know-how and engineering or by supplying the entire package
Usina Tropical, Brazil (2nd unit)
Owner : British Petroleum

Capacity : 12,000 TCD
Type : Fixed bed, 14 Chain strands
Width : 11.4. Mt
Completion time : 16 months
Status : Under Construction
Maple Etanol, Peru
Owner : Maple Energy

Capacity : 5,000 TCD
Type : Fixed bed, 6 Chain strands
Width : 3.8. Mt
Completion time : 24 months
Status : In operation in 2012
Usina Pedro Alfonso, Brazil
Owner : Bunge

Capacity : 10,000 TCD
Type : Fixed bed, 12Chain strands
Width : 10.2. Mt
Completion time : 16 months
Status : In operation in 2011
Aroeira Bioenergetica, Brazil
Owner : Aroeira Bioenergetica, S.A.

Capacity : 4,000 TCD
Type : Fixed bed, 4 Chain strands
Width : 3.8. Mt
Completion time : 16 months
Status : In operation in 2010
Usina Tropical, Brazil (1st unit)
Owner : British Petroleum

Capacity : 12,000 TCD
Type : Fixed bed, 14 Chain strands
Width : 11.4. Mt
Completion time : 16 months
Status : In Operation since 2010
Ingenio Valdez, Ecuador
Owner : Grupo Noboa

Capacity : 12,000 TCD
Type : Fixed bed, 12 Chain strands
Width : 11.4.0 Mt
Completion time : 18 months
Status : In operation in 2010
Sucroalcoholera del Chira, Peru
Owner : Grupo Romero

Capacity : 4,000 TCD
Type : Fixed bed, 6 Chain strands
Width : 3.8. Mt
Completion time : 24 months
Status : In operation in 2009
Usina Oroeste, Brazil
Owner : Bunge

Capacity : 10,000 TCD
Type : Fixed bed, 12 Chain strands
Width : 10.0 Mt
Completion time : 18 months
Status : In operation in 2008
Usina Sao Francisco, Brazil
Owner : Grupo USJ

Capacity : 10,000 TCD
Type : Fixed bed, 12 Chain strands
Width : 10.2. Mt
Completion time : 16 months
Status : In operation since 2007
Usina Guariroba, Brazil
Owner : Bunge

Capacity : 8,000 TCD
Type : Fixed bed, 10 Chain strands
Width : 8.8 Mt
Completion time : 18 months
Status : In operation in 2007
Usina Frutal, Brazil
Owner : Bunge

Capacity : 10,000 TCD
Type : Fixed bed, 12 Chain strands
Width : 10.0 Mt
Completion time : 18 months
Status : In operation in 2006
Usina Vale do Paranaiba, Brazil
Owner : Grupo Joao Lyra

Capacity : 6,000 TCD
Type : Fixed bed, 8 Chain strands
Width : 6.6 Mt
Completion time : 18 months
Status : In operation in 2005
Usina Vertente, Brazil
Owner : Grupo Humus Agroterra / Grupo Guarani

Capacity : 6,000 TCD
Type : Fixed bed, 8 Chain strands
Width : 6.6.0 Mt
Completion time : 18 months
Status : In operation in 2004
Usina Cevasa, Brazil
Owner : Cargill / Canagril

Capacity : 4,000 TCD
Type : Fixed bed, 4 Chain strands
Width : 3.8. Mt
Completion time : 16 months
Status : In operation in 2004
Louisiana Green Fuels, USA
Owner : Louisiana Green Fuels

Capacity : 10,000 TCD
Type : Fixed bed, 12 Chain strands
Width : 10.0 Mt
Contracting modality : EPCM
Completion time : 22 months
Status : In operation in...
Ingenio Providencia, Argentina
Owner : Arcor

Capacity : 10,000 TCD
Type : Fixed bed, 12 Chain strands
Width : 10.0 Mt
Completion time : 14 months
Status : In operation in 1997
Usina Vale do Rosario, Brazil
Owner : Biosev - Louis Dreyfus

Capacity : 10,000 TCD
Type : Fixed bed, 12 Chain strands
Width : 10.0 Mt
Completion time : 14 months
Status : In operation in 1996
Usina Cruz Alta de Olimpia, Brazil
Owner : Guarani

Capacity : 8,000 TCD
Type : Fixed bed, 10 Chain strands
Width : 8.8 Mt
Completion time : 18 months
Status : In operation in 1985
Usina Galo Bravo, Brazil
Owner : Usina Galo Bravo S.A.

Capacity : 4,000 TCD
Type : Fixed bed, 3 Chain strands
Width : 3.3 Mt
Completion time : 18 months
Status : In operation in 1983
Diffuser systems
